• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Recovery of Fe2O3 & TiO2 from Bauxite Processing Waste
Recovery of Fe2O3 & TiO2 from Bauxite Processing Waste

Recovery of Fe2O3 & TiO2 from Bauxite Processing Waste

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Assaying Gold
Assaying Gold

Gold assaying is essential in determining the amount of gold in a mineral deposit. There are various gold assaying pro... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery (Battery Assembly)
Lithium Ion Battery (Battery Assembly)

Lithium batteries are now powering a wide range of electrical and electronical devices, including laptop computers, mo... Read More

Capacity :
48 Volt, 20 AH Lithium-Ion Battery Pack: 3498 Nos Per Day
Plant and Machinery cost:
5053.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
7215.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

E-WASTE is a collective name for discarded electronic devices that enter the waste stream from various sources. It inc... Read More

Capacity :
Plastic Granules : 141000 Kgs./Annum Glass Scrap : 105900 Kgs./Annum Copper Scrap : 88200 Kgs./An
Plant and Machinery cost:
106.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
72.00 %
TCI :
0.00 Lakhs
Cost of Project :
190.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes
Disposable Plastic Syringes

Disposable Syringes are made of plas... Read More

Capacity :
Disposable Plastic Syringes 2 ml Size : 300,000 Boxes/Annum Disposable Plastic Syringes 5 ml Size
Plant and Machinery cost:
802.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
44.00 %
TCI :
1474.00 Lakhs
Cost of Project :
1474.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a description of surplus, obsolete, broken or discarded... Read More

Capacity :
Copper Wire: 500mt/annum Plastic Granules: 2230mt/annum Glass: 970mt/annum Ferrous Metal: 800mt/annu
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
51800000.00Lakhs
Add To Inquiry Basket
Biomedical Waste Recycling
Biomedical Waste Recycling

Biomedical waste is waste that is either putrescible or potentially infectious. Biomedical waste may also include waste associated with the generat... Read More

Capacity :
Plastic Granules 3 MT/Day •Recycled Paper 3 MT/Day •Recycled Glass 1 MT/Day •Recycled Metal 0.50 MT/
Plant and Machinery cost:
214.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.65%
Break Even Point (BEP):
52.47 %
TCI :
1182.00 Lakhs
Cost of Project :
1182.00Lakhs
Add To Inquiry Basket
Bicycle Tubes
Bicycle Tubes

Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyre... Read More

Capacity :
Bicycle Tubes: 10,000 Nos. /Day
Plant and Machinery cost:
118.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
622.00 Lakhs
Cost of Project :
622.00Lakhs
Add To Inquiry Basket
Calcined Bauxite through Rotary Kiln
Calcined Bauxite through Rotary Kiln
Calcined bauxite is an important raw material for two main markets: refractories and abrasives. Smaller volumes are consumed in other applications in... Read More
Capacity :
100 MT/Day
Plant and Machinery cost:
825.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
49.00 %
TCI :
1352.00 Lakhs
Cost of Project :
1352.00Lakhs
Add To Inquiry Basket
Ferroalloys (Ferrosilicon, Ferromanganese & Silicomanganese)
Ferroalloys (Ferrosilicon, Ferromanganese & Silicomanganese)

Ferromanganese are alloys composed of iron and one or two more metals like Mn, Si, Ti, W etc. The ferro alloys have usually lower melting points th... Read More

Capacity :
Ferrosilicon:59.0 MT/Day.,Ferromanganese:167.0 MT/Day.,Silicomanganese:130.5 MT/Day.
Plant and Machinery cost:
2493.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
41.00 %
TCI :
4280.00 Lakhs
Cost of Project :
4280.00Lakhs
Add To Inquiry Basket
Disposable Plastic Syringes with Needles
Disposable Plastic Syringes with Needles

Disposable Syringes made of plastic ... Read More

Capacity :
Syringes (1 ml) :14,000.0 Nos./Day.,Syringes (3 ml):14,000.0 Nos./Day.,Syringes (5 ml):14,000.0 Nos.
Plant and Machinery cost:
174.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
40.00 %
TCI :
515.00 Lakhs
Cost of Project :
515.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese (Medium Grade)
Low Carbon Ferromanganese (Medium Grade)

In igneous rocks, which comprise 95% of the earth's crust the average percentage concentration of manganous oxide is 0.124. This is small in compar... Read More

Capacity :
10 MT/Day.
Plant and Machinery cost:
256.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
65.00 %
TCI :
691.00 Lakhs
Cost of Project :
691.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water
Packaged Drinking Water

Water is the necessity of our daily life, it’s so important for us that we need clean, safe and sanitary water every day, and us... Read More

Capacity :
210 Lakhs Nos. /annum
Plant and Machinery cost:
719.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
56.00 %
TCI :
1736.00 Lakhs
Cost of Project :
1736.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with PET Bottles
Packaged Drinking Water with PET Bottles
Profile Water forms an essential part of every human being. Since it is a human necessity it makes best sense to do business in. As a normal human b... Read More
Capacity :
Plant and Machinery cost:
131.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
58.00 %
TCI :
350.00 Lakhs
Cost of Project :
350.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

E-waste is a popular, informal name for electronic products nearing the end of their useful life. While there is no generally accepted definition o... Read More

Capacity :
2164500 kgs. /annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.91%
Break Even Point (BEP):
49.81 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
E Waste Recycling Plant
E Waste Recycling Plant

E waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers, a... Read More

Capacity :
5 MT/Day
Plant and Machinery cost:
60.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
15.00%
Break Even Point (BEP):
43.00 %
TCI :
241.00 Lakhs
Cost of Project :
241.00Lakhs
Add To Inquiry Basket
Curcumin(Turmeric) The Indian solid gold
Curcumin(Turmeric) The Indian solid gold

PRODUCT PROFILE Curcumin is the principal curcuminoid of the popular Indian spice turmeric, which is a member of the ginger family. It is the main ... Read More

Capacity :
23400 Kg/Annum, Curcumin 23400 kg/Annum, Turmeric oil 550 MT/ Annum, De-oiled turmeric powder
Plant and Machinery cost:
122.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
54.00%
Break Even Point (BEP):
51.00 %
TCI :
289.00 Lakhs
Cost of Project :
289.00Lakhs
Add To Inquiry Basket
E-WASTE RECYCLING PLANT
E-WASTE RECYCLING PLANT

Electronic waste, e-waste, e-scrap, or Waste Electrical and Electronic Equipment (WEEE) is a loose category of surplus, obsolete, broken, or discar... Read More

Capacity :
-
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
40.00 %
TCI :
196.00 Lakhs
Cost of Project :
196.00Lakhs
Add To Inquiry Basket
FERROALLOYS - FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS
FERROALLOYS - FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS

The ferroalloys are classified as bulk ferro alloys & noble ferro alloys. Bulk ferro alloys include ferro chrome/charge chrome ferro manganese,... Read More

Capacity :
1800 MT/Annum Ferro Manganese, 900 MT/Annum Silico Manganese, 900 MT/Annum Ferro Silicon
Plant and Machinery cost:
87.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
74.00 %
TCI :
283.00 Lakhs
Cost of Project :
283.00Lakhs
Add To Inquiry Basket
DISPOSABLE PLASTIC SYRINGES WITH NEEDLES
DISPOSABLE PLASTIC SYRINGES WITH NEEDLES

Disposable syringes are a great inno... Read More

Capacity :
120 Lakhs/ Annum
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
48.00 %
TCI :
253.00 Lakhs
Cost of Project :
253.00Lakhs
Add To Inquiry Basket
FERROALLOYS-FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS
FERROALLOYS-FERROMANGANESE, SILICOMANGANESE, FERROSILICON BASED ON ALUMINOTHERMIC PROCESS

The primary objective of the study is to review the technological status of ferroalloys industry in the country in the area of bulk production of s... Read More

Capacity :
12 MT/Day, Ferro Manganese –6 MT/Day, Silico Manganese 3 MT/Day, Ferro Silicon 3 MT/Day
Plant and Machinery cost:
75.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
79.00 %
TCI :
242.00 Lakhs
Cost of Project :
242.00Lakhs
Add To Inquiry Basket
HIGH CARBON FERROMANGANESE
HIGH CARBON FERROMANGANESE

Ferroalloys are alloys with iron employed to add chemical elements into molten metal, usually during steelmaking. Ferroalloys impart distinctive qu... Read More

Capacity :
15000 MT/Annum
Plant and Machinery cost:
1032.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
67.00 %
TCI :
2319.00 Lakhs
Cost of Project :
2319.00Lakhs
Add To Inquiry Basket
Growing Prospects for Packaged Drinking Water Industry
Growing Prospects for Packaged Drinking Water Industry

Water everywhere, not a CLEAN drop to drink! Who would have thought that there will be a day when sanitation of available water would be more of a... Read More

Capacity :
30,000 Thousand Nos./Annum or 1,00,000 Bottles /day
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
63.00 %
TCI :
282.00 Lakhs
Cost of Project :
282.00Lakhs
Add To Inquiry Basket
Alumina from Bauxite (By Calcination Process)
Alumina from Bauxite (By Calcination Process)

-

Read More
Capacity :
66.66 MT/Day
Plant and Machinery cost:
671.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
38.00 %
TCI :
2112.00 Lakhs
Cost of Project :
2112.00Lakhs
Add To Inquiry Basket
MANGANESE SULPHATE
MANGANESE SULPHATE
Manganese sulphate is commercially one of the most important compounds. It is an important mineral based chemical industry. The main constituent of t... Read More
Capacity :
2.00 MT / Day
Plant and Machinery cost:
31.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
42.00%
Break Even Point (BEP):
41.00 %
TCI :
126.00 Lakhs
Cost of Project :
126.00Lakhs
Add To Inquiry Basket
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask
MEDICAL DISPOSABLES: Disposable Syringes (Self Destructive) with Needles, Catheters and Mask

Disposable needle is widely used by ... Read More

Capacity :
0
Plant and Machinery cost:
147.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
47.00 %
TCI :
426.00 Lakhs
Cost of Project :
426.00Lakhs
Add To Inquiry Basket
BENEFICIATION OF CHROMIUM, NICKEL AND MANGANESE ORE
BENEFICIATION OF CHROMIUM, NICKEL AND MANGANESE ORE

Chromium is the 21st most abundant metal in the Earths crust. The only commercial ore of chromium is the chromite. Most chromite ores are rich enou... Read More

Capacity :
30,000 MT/ Annum each ores
Plant and Machinery cost:
896.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
49.00 %
TCI :
3528.00 Lakhs
Cost of Project :
3528.00Lakhs
Add To Inquiry Basket
Manganese from Ferromanganese Alloy Slag Content
Manganese from Ferromanganese Alloy Slag Content

Manganese from Ferromanganese  Alloy Slag Content 30% Read More

Capacity :
5 MT/Day
Plant and Machinery cost:
50.00 Lakhs
Working Capital :
109.00
Rate of Return (ROR):
47.43%
Break Even Point (BEP):
68.36 %
TCI :
226.00 Lakhs
Cost of Project :
226.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese
Low Carbon Ferromanganese

Manganese ores, containing more than 35 % manganese are suitable for the manufacture of high or low grade ferro-manganese. Low carbon ferro mangane... Read More

Capacity :
50 MT/Day
Plant and Machinery cost:
104.00 Lakhs
Working Capital :
885.00
Rate of Return (ROR):
66.12%
Break Even Point (BEP):
40.99 %
TCI :
1129.00 Lakhs
Cost of Project :
1129.00Lakhs
Add To Inquiry Basket
Paper Napkins
Paper Napkins

Tissue paper is often used for wrapping as in jewellery, liquors, fruits and florist trades etc. Napkins are manufactured from tissues. Paper napki... Read More

Capacity :
400 Kgs./ Day
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.88%
Break Even Point (BEP):
47.25 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Aluminium From Bauxite of Gibbsite Variety
Aluminium From Bauxite of Gibbsite Variety

Residual rocks, in which the alumina trihydrate and monohydrate minerals gibbsite, boehmite, and diaspore predominate are classified as bauxite. Ot... Read More

Capacity :
20000 MT/Annum
Plant and Machinery cost:
615.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
17.00%
Break Even Point (BEP):
54.00 %
TCI :
1875.00 Lakhs
Cost of Project :
1875.00Lakhs
Add To Inquiry Basket
Bicycle Tyres
Bicycle Tyres

Bicycle tyre is the backbone of the cycle industries. There are few numbers of organized manufacturing companies are engaged in the quality grade c... Read More

Capacity :
4000 Nos./Day
Plant and Machinery cost:
36.00 Lakhs
Working Capital :
57.00
Rate of Return (ROR):
59.50%
Break Even Point (BEP):
38.47 %
TCI :
163.00 Lakhs
Cost of Project :
163.00Lakhs
Add To Inquiry Basket
Wooden Furniture
Wooden Furniture

The furniture making is an ancient art in India before centuries. The expertise of India in manufacturing furniture was accepted by all the parts o... Read More

Capacity :
20 Pcs/Day
Plant and Machinery cost:
4.00 Lakhs
Working Capital :
5.00
Rate of Return (ROR):
111.00%
Break Even Point (BEP):
26.99 %
TCI :
13.00 Lakhs
Cost of Project :
13.00Lakhs
Add To Inquiry Basket
Wooden Furniture (With Mediocre Automation)
Wooden Furniture (With Mediocre Automation)

The term wooden furniture is used for articles of daily use in dwelling house, place of business, public buildings, and includes items such as chai... Read More

Capacity :
20 Articles/Day
Plant and Machinery cost:
13.00 Lakhs
Working Capital :
28.00
Rate of Return (ROR):
42.81%
Break Even Point (BEP):
48.28 %
TCI :
73.00 Lakhs
Cost of Project :
73.00Lakhs
Add To Inquiry Basket
Setup E-Waste Recycling Plant
Setup E-Waste Recycling Plant

Electronic wastes are super... Read More

Capacity :
Plastic:1.28 MT/day Ferrous Material:0.80 MT/dayAluminium:0.56 MT/dayGlass:0.80 MT/day Copper:0.56 M
Plant and Machinery cost:
87.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
62.00 %
TCI :
0.00 Lakhs
Cost of Project :
371.00Lakhs
Add To Inquiry Basket
Start Quartz Slabs Manufacturing Business A Lucrative Business Plan
Start Quartz Slabs Manufacturing Business A Lucrative Business Plan

 

Introduct... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Float Glass (Electricity Dependence on Solar (on Plant Roof Top) and  Furnace Heat Recycling inside the Plant) Production Business
Float Glass (Electricity Dependence on Solar (on Plant Roof Top) and Furnace Heat Recycling inside the Plant) Production Business

 

Float glass typically has a compressive strength that is substantially higher than its tensile strength. In ... Read More

Capacity :
8000 Sq.Mtrs. per Day
Plant and Machinery cost:
20600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
27.00 %
TCI :
0.00 Lakhs
Cost of Project :
27000.00Lakhs
Add To Inquiry Basket
Aluminium Foil (Pharma Grade) Manufacturing Business
Aluminium Foil (Pharma Grade) Manufacturing Business

A thin metal sheet is aluminium foil. As a result, it can operate as a complete barrier to mould, moisture, gases, scents, ... Read More

Capacity :
12 MT per day
Plant and Machinery cost:
1500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
2200.00Lakhs
Add To Inquiry Basket
Set up Sugar Plant
Set up Sugar Plant

 

A sweet, crystalline material made from sugar cane and sugar beet is referred to as sugar. It has countless ... Read More

Capacity :
0
Plant and Machinery cost:
14900.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
24300.00Lakhs
Add To Inquiry Basket
Glass Fiber Reinforced Polymer (GFRP) Rebar Manufacturing Business
Glass Fiber Reinforced Polymer (GFRP) Rebar Manufacturing Business

Rebar made of glass fibre reinforced polymer is a highly valuable building material. Governments and other large-scale... Read More

Capacity :
1200 MT per Day
Plant and Machinery cost:
58800000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
609700000.00Lakhs
Add To Inquiry Basket
Business Plan Production of Sodium Hypochlorite Start your Business in Chemical Industry
Business Plan Production of Sodium Hypochlorite Start your Business in Chemical Industry

 

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
India Hydrofluorocarbons Market
India Hydrofluorocarbons Market

 

Hydrofluorocarbons, or HFCs, are man-made Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Chilli Oleoresin Manufacturing Business
Chilli Oleoresin Manufacturing Business

Paprika oleoresin is a natural food colorant used to obtain ... Read More

Capacity :
Chilli Oleoresin 7,500 Kg Per Day
Plant and Machinery cost:
2192.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
3533.00Lakhs
Add To Inquiry Basket
Setting Up Banana Ripening Chamber
Setting Up Banana Ripening Chamber

A banana ripening chamber is a controlled environment where ... Read More

Capacity :
Ripe Banana 8 MT per day
Plant and Machinery cost:
32.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
193.00Lakhs
Add To Inquiry Basket
Set up Mini Steel Plant (Billets and TMT Bar)
Set up Mini Steel Plant (Billets and TMT Bar)

 

A mini steel plant is a smaller version of an inte... Read More

Capacity :
Steel Billets 150 MT Per Day TMT Steel Bars (Rebar) 150 MT Per Day
Plant and Machinery cost:
5445.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
37.00 %
TCI :
0.00 Lakhs
Cost of Project :
10417.00Lakhs
Add To Inquiry Basket
Start Creamy Peanut Butter Production Business
Start Creamy Peanut Butter Production Business

Creamy peanut butter is a type of peanut butter that has bee... Read More

Capacity :
Creamy Peanut Butter 10,000 Kgs per day
Plant and Machinery cost:
128.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
1038.00Lakhs
Add To Inquiry Basket
Start Production Business Of Electric Vehicles (Electric Motorbikes and Electric Scooters)
Start Production Business Of Electric Vehicles (Electric Motorbikes and Electric Scooters)

 

An electric vehicle is a vehicle that uses electricity to power its motors. Ele... Read More

Capacity :
Electric Motorbikes 10.0 Nos. Per Day Electric Scooters 10.0 Nos. Per Day
Plant and Machinery cost:
251.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
1724.00Lakhs
Add To Inquiry Basket
Setting up uPVC and CPVC Pipes Business
Setting up uPVC and CPVC Pipes Business

 

uPVC is an acronym for un-plasticized polyvinyl chloride. It is also known as r... Read More

Capacity :
CPVC Pipes 50 mm 4 MT Per Day uPVC Pipes 150 mm 8 MT Per Day
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
414.00Lakhs
Add To Inquiry Basket
Fertilizers Manufacturing Handbook
Fertilizers Manufacturing Handbook

Starting a fertilizer manuf... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
High Demandable Business of Zinc Ingots Manufacturing Business of Zinc Ingots
High Demandable Business of Zinc Ingots Manufacturing Business of Zinc Ingots

Zinc ingots... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Paint Roller Manufacturing Business Industry of Paint Roller Manufacturing
Start Paint Roller Manufacturing Business Industry of Paint Roller Manufacturing

One of the finest ways to get a professional paint finish is with <... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How To Start Medium-Density Polyethylene (MDPE) Pipes Manufacturing Business Medium-Density Polyethylene (MDPE) Pipes Business
How To Start Medium-Density Polyethylene (MDPE) Pipes Manufacturing Business Medium-Density Polyethylene (MDPE) Pipes Business

 

How do Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan For Curcumin Extraction Unit
A Business Plan For Curcumin Extraction Unit

 

Curcumin Extracti... Read More

Capacity :
15,000 Kgs Per Annum , 7,140 Kgs Per Annum , , 2,76,300 Kgs Per Annum
Plant and Machinery cost:
216.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
53.00 %
TCI :
0.00 Lakhs
Cost of Project :
511.00Lakhs
Add To Inquiry Basket
Start Business of Trading of Spices (Coriander, Chilli, Turmeric & Cumin)
Start Business of Trading of Spices (Coriander, Chilli, Turmeric & Cumin)

 

Indian culture has a very long history with sp... Read More

Capacity :
300 MT Per Annum , 300 MT Per Annum , 300 MT Per Annum , 300 MT Per Annum
Plant and Machinery cost:
6.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
44.00Lakhs
Add To Inquiry Basket
Setup Plant of Super Absorbent Polymer (SAP)
Setup Plant of Super Absorbent Polymer (SAP)

A superabsorbent polymer (SAP) is a type of polymer that has the ability to absorb an... Read More

Capacity :
Super Absorbent Polymer 8,000 MT Per Annum
Plant and Machinery cost:
1200.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
2100.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
A Business Plan for IV Fl... IV Fluids (500 ml Size Pack) 78,000 Packs Per Day 27.00 1263.00
Start Industry of Liquor ... Wine (750 ml Size) 4,000,000 Bottles per annum Whiskey (375 ml Size) 4,000,000 Bottles per annum B 28.00 1880.00
Setup Pharmaceutical Unit... - 37.00 35774.00
Start Industry with Serum... 0 0.00 0.00
Setup Unit Of Cement Plan... Cement Plant 40,000 Bags per Day 26.00 25200.00
A Business Plan for Steri... Sterial Water for Injection 500 ml Size Pack 20,000 Sachets Per Day 30.00 1234.00
Setup Plant Of Lead From ... Lead Ingot 30 MT Per Day 28.00 2231.00
A Business Plan Blood Col... - 28.00 2294.00
A Business Plan for Parac... Paracetamol Powder 7 MT Per Day 27.00 779.00
Start Manufacturing Busin... Baby Diapers (4 Pcs.) 84,000 Pkts Per Day Adult Diapers (4 Pcs.) 18,000 Pkts Per Day Sanitary 29.00 4201.00
Start Tissue Paper Manufa... Tissue Paper 20 MT Per Day 27.00 2101.00
Launching a Solar Panel ... Solar Panel 500 MW per annum 32.00 5353.00
Biodegradable Disposable ... - 27.00 2774.00
Setup Curcumin Extraction... Curcumin Powder 100 Kgs per day Turmeric Oil 47 Kgs per day Deoiled Turmeric 1,853 Kgs 28.00 491.00
Setup Active Pharmaceutic... Paracetamol 10,000 Kgs Per Day Azithromycin 10,000 Kgs Per Day Metformin 10,000 Kgs 33.00 5246.00
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
12345678910...

Showing 241 - 300 of 629 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR